MWH Treatment

the Digital Era is Here!

are you ready to take Construction Verification to the Next Level?

MWH_Case_Study_Content2.jpg
 
 

Case Study: Pre-Construction

Learn how MWH Treatment used digital construction verification to conduct pre-installation checks and verification of factory equipment prior to delivery on site.

 
 

Case Study: On-going Construction

MWH Treatment adopted digital construction verification and used it for progress checking and tracking throughout on-going construction projects. Detailed comparison of 3D models and 3D scans of a water treatment plant.

 
 

Case Study: Post-Construction

MWH Treatment used digital construction verification rather than traditional redline markups to verify the as-built state of their project.

 
 
Watch Video  HERE  : Mr. Raghu Gondi shares about the benefits he and his team gained by adopting Airsquire’s technology

Watch Video HERE : Mr. Raghu Gondi shares about the benefits he and his team gained by adopting Airsquire’s technology